Through this videos, you can learn about the new 3 axle low bed trailer for sale.
This normal-type low bed truck trailer is the most popular type low bed trailer with a loading capacity from 20 - 80 tons, the low bed trailer equipped with 2-4 axles, model for 13-20 ton axles. Usually equipped with the spring ladders for the machines such as the wheel loaders, excavators, or some different types of wheeled machines transportation. The high of the working platform is various from 1000mm to 1200mm.
Production Process Of Lowbed Truck Trailer
Before production, TITAN technical department must first design and produce drawings according to the needs of the user and the market, so that the technical parameters of the main 40ft step deck trailer and 40ft low bed trailer are matched, and then transferred to the manufacturing department.
1. Stage of cutting steel sheet material
According to the drawings of each part produced by the design department, each part is cut out with a CNC cutting machine, such as beam webs, reinforcement plates, standard small accessories and so on.
2. Submerged arc welding beams, beams fixed
The second step is to fix the cut web and the upper and lower wing plates to weld points, and then weld the beam by submerged arc welding.
3. Opening, calibration beam, through beam
First cut out the web of the beam to cut out U-shaped holes through which the beams can pass, and then fix the welded I-beams in parallel. The result of comparing the beams is very important. If two I-beams have large parallel errors, very serious tire wear will occur.
4. Connect side beams, welding king pins
At this time, the 40 feet low bed trailer of the main beam is basically formed, only the side beams are welded to form the frame structure. And the traction pin traction plate is welded to the position required in the contract, the welding process is required to be high, otherwise, the lowbed truck trailer will be skewed.
5. Welding frame, welding suspension
At this time, the welding suspension must strictly control the size and maintain the squareness, otherwise it will cause 2 axle low loader for sale malaysia of tire wear.
6. Attach the front neck
Drop deck trailer with front neck have this process, and low loader for sale in kenya do not have this process. The front neck of the low bed trailer is welded up. Welding is done to strengthen the plate. There is no problem with the strength. TITAN used 4 axle low loader for sale malaysia have also considered it in advance.
7. Lay the bottom plate
That is, the 40 feet low bed trailer of the bottom plate is fully welded on the frame. There is nothing to say at this step.
8. Frosted and painted
Frosting is the previous step of spray painting. Some manufacturers without shot blasting workshops will blow and polish the welding slag with high pressure gas at this stage.
Spray paint is usually sprayed in a well-ventilated shed. If you want to spray beautifully, you must first look at the coating and the technology of the technicians, but TITAN 40 feet low bed trailer will spray very beautifully. Basically, you don’t have to worry about this. We will be very attentive!